GRASIAN ASACUSA PBARA POSITRON-LAB HD-BEAM ADV-INST DEPRECATED-ELOG
ASACUSA-MAIN ASACUSA-SPECTROSCOPY ASACUSA-BEAM-PRODUCTION ASACUSA-ARCHIVE ASACUSA-HOW-TO
HBAR-HFS ARCHIVED
MAIN PLASMA CUSP PBAR POSITRON PROTON DETECTOR SLOWEXT ARCHIVE HOW-TO
  ARCHIVE  Not logged in ELOG logo
Message ID: 1143     Entry time: Wed Sep 13 14:28:26 2023
Author: Angela Gligorova 
Type: Images 
Category:  
Subject: pbar-A Power Supplies scheme 
Attachment 1: PS_scheme.jpg  2.415 MB  Uploaded Wed Sep 13 16:36:28 2023  | Hide | Hide all | Show all
PS_scheme.jpg
Attachment 2: Coil_response.jpg  847 kB  Uploaded Thu Sep 14 11:52:52 2023  | Hide | Hide all | Show all
Coil_response.jpg
Attachment 3: idsru.png  391 kB  Uploaded Thu Sep 14 14:47:41 2023  | Hide | Hide all | Show all
idsru.png
Attachment 4: emit.png  338 kB  Uploaded Thu Sep 14 14:56:08 2023  | Show | Hide all | Show all
ELOG V3.1.5-fc6679b