GRASIAN ASACUSA PBARA POSITRON-LAB HD-BEAM ADV-INST DEPRECATED-ELOG
ASACUSA-MAIN ASACUSA-SPECTROSCOPY ASACUSA-BEAM-PRODUCTION ASACUSA-ARCHIVE ASACUSA-HOW-TO
HBAR-HFS ARCHIVED
MAIN PLASMA CUSP PBAR POSITRON PROTON DETECTOR SLOWEXT ARCHIVE HOW-TO
  ARCHIVE  Not logged in ELOG logo
Message ID: 219     Entry time: Fri May 28 11:24:06 2021
Author: Dan Murtagh 
Type: Entries from previous ELOG 
Category: Dan-san 
Subject: Positron update emails from 2012/ Dan-san makes mistakes with his first trap 

These were emails I wrote in 2012 when I was first setting up the new positron trap arrangement after each shift. 

If I find more than these, I'll upload to this elog entry. 

 

Attachment 1: PU12062012.pdf  78 kB  Uploaded Fri May 28 13:24:16 2021  | Show | Hide all | Show all
Attachment 2: PU19062012.pdf  87 kB  Uploaded Fri May 28 13:24:16 2021  | Hide | Hide all | Show all
Cannot create thumbnail, please check ImageMagick installation
Attachment 3: Positron_Update_-_Transport_to_the_cusp.pdf  340 kB  Uploaded Fri May 28 13:24:16 2021  | Show | Hide all | Show all
Attachment 4: PositronUpdate16062012.pdf  85 kB  Uploaded Fri May 28 13:24:16 2021  | Hide | Hide all | Show all
Cannot create thumbnail, please check ImageMagick installation
Attachment 5: PositronUpdate18062012.pdf  89 kB  Uploaded Fri May 28 13:24:16 2021  | Hide | Hide all | Show all
Cannot create thumbnail, please check ImageMagick installation
Attachment 6: PositronUpdate-StabilityOfTheTrap.pdf  176 kB  Uploaded Fri May 28 13:24:16 2021  | Hide | Hide all | Show all
Cannot create thumbnail, please check ImageMagick installation
ELOG V3.1.5-fc6679b