GRASIAN ASACUSA PBARA POSITRON-LAB HD-BEAM ADV-INST DEPRECATED-ELOG
ASACUSA-MAIN ASACUSA-SPECTROSCOPY ASACUSA-BEAM-PRODUCTION ASACUSA-ARCHIVE ASACUSA-HOW-TO
HBAR-HFS ARCHIVED
MAIN PLASMA CUSP PBAR POSITRON PROTON DETECTOR SLOWEXT ARCHIVE HOW-TO
  ARCHIVE  Not logged in ELOG logo
Message ID: 519     Entry time: Wed Mar 23 14:40:36 2022
Author: Cusp Trap 
Type: wednesday fps 
Category:  
Subject:  
Attachment 1: 2nd_stage_elkonite.jpg  291 kB  Uploaded Wed Mar 23 15:40:42 2022  | Hide | Hide all | Show all
2nd_stage_elkonite.jpg
Attachment 2: coldhead_removal_1.jpg  1.815 MB  Uploaded Wed Mar 23 15:40:48 2022  | Hide | Hide all | Show all
coldhead_removal_1.jpg
Attachment 3: coldhead_removed_1.jpg  370 kB  Uploaded Wed Mar 23 15:40:54 2022  | Show | Hide all | Show all
Attachment 4: coldhead_1.jpg  408 kB  Uploaded Wed Mar 23 15:40:57 2022  | Show | Hide all | Show all
Attachment 5: diode_1.jpg  267 kB  Uploaded Wed Mar 23 15:41:00 2022  | Hide | Hide all | Show all
diode_1.jpg
Attachment 6: elkonite_shield_1.jpg  227 kB  Uploaded Wed Mar 23 15:41:03 2022  | Hide | Hide all | Show all
elkonite_shield_1.jpg
Attachment 7: support_rods_1.jpg  368 kB  Uploaded Wed Mar 23 15:41:07 2022  | Hide | Hide all | Show all
support_rods_1.jpg
Attachment 8: wiring_1.jpg  347 kB  Uploaded Wed Mar 23 15:41:11 2022  | Hide | Hide all | Show all
wiring_1.jpg
ELOG V3.1.5-fc6679b