GRASIAN ASACUSA PBARA POSITRON-LAB HD-BEAM ADV-INST DEPRECATED-ELOG
ASACUSA-MAIN ASACUSA-SPECTROSCOPY ASACUSA-BEAM-PRODUCTION ASACUSA-ARCHIVE ASACUSA-HOW-TO
HBAR-HFS ARCHIVED
MAIN PLASMA CUSP PBAR POSITRON PROTON DETECTOR SLOWEXT ARCHIVE HOW-TO
  ARCHIVE  Not logged in ELOG logo
Message ID: 520     Entry time: Thu Mar 24 11:57:38 2022
Author: Andreas Lanz 
Type: Thursday FPS 
Category:  
Subject:  
Attachment 1: coldhead.jpg  1.050 MB  Uploaded Thu Mar 24 12:57:46 2022  | Hide | Hide all | Show all
coldhead.jpg
Attachment 2: copper_gaskets_Elkonite_1.jpg  759 kB  Uploaded Thu Mar 24 12:57:54 2022  | Hide | Hide all | Show all
copper_gaskets_Elkonite_1.jpg
Attachment 3: Elkonite_shield.jpg  825 kB  Uploaded Thu Mar 24 12:58:00 2022  | Hide | Hide all | Show all
Elkonite_shield.jpg
Attachment 4: storage_elkonite_1.jpg  904 kB  Uploaded Thu Mar 24 12:58:07 2022  | Hide | Hide all | Show all
storage_elkonite_1.jpg
Attachment 5: removed_Elkonite_1.jpg  934 kB  Uploaded Thu Mar 24 12:58:11 2022  | Hide | Hide all | Show all
removed_Elkonite_1.jpg
Attachment 6: whole_coldhead_1.jpg  370 kB  Uploaded Thu Mar 24 12:58:15 2022  | Hide | Hide all | Show all
whole_coldhead_1.jpg
Attachment 7: marked_wires.jpg  871 kB  Uploaded Thu Mar 24 14:20:17 2022  | Show | Hide all | Show all
Attachment 8: white_wires.jpg  771 kB  Uploaded Thu Mar 24 14:20:27 2022  | Show | Hide all | Show all
Attachment 9: upper_diode.jpg  901 kB  Uploaded Thu Mar 24 14:20:45 2022  | Hide | Hide all | Show all
upper_diode.jpg
Attachment 10: lower_diode.jpg  853 kB  Uploaded Thu Mar 24 14:23:54 2022  | Hide | Hide all | Show all
lower_diode.jpg
Attachment 11: feedthrough_wiring.png  941 kB  Uploaded Fri Mar 25 16:52:43 2022  | Hide | Hide all | Show all
feedthrough_wiring.png
ELOG V3.1.5-fc6679b