GRASIAN ASACUSA PBARA POSITRON-LAB HD-BEAM ADV-INST DEPRECATED-ELOG
ASACUSA-MAIN ASACUSA-SPECTROSCOPY ASACUSA-BEAM-PRODUCTION ASACUSA-ARCHIVE ASACUSA-HOW-TO
HBAR-HFS ARCHIVED
MAIN PLASMA CUSP PBAR POSITRON PROTON DETECTOR SLOWEXT ARCHIVE HOW-TO
  ARCHIVE  Not logged in ELOG logo
Message ID: 538     Entry time: Tue Apr 19 23:03:47 2022
Author: Cusp Trap 
Type: Photos 
Category: Drifttube 
Subject:  

An extension duct + TMP were connected at the bottom of the downstream side of the drifttube (deflectors are inside) -> Replaced with GV + NEG + extension duct + TMP. Two angle plates were removed from the support structure so as not to interfere with GV.

Attachment 1: 20220419_095747.jpg  1.254 MB  Uploaded Wed Apr 20 01:09:03 2022  | Hide | Hide all | Show all
20220419_095747.jpg
Attachment 2: 20220419_100021.jpg  1.076 MB  Uploaded Wed Apr 20 01:09:18 2022  | Hide | Hide all | Show all
20220419_100021.jpg
Attachment 3: 20220419_100033.jpg  1.059 MB  Uploaded Wed Apr 20 01:09:33 2022  | Show | Hide all | Show all
Attachment 4: 20220419_143533.jpg  988 kB  Uploaded Wed Apr 20 01:09:48 2022  | Hide | Hide all | Show all
20220419_143533.jpg
Attachment 5: 20220419_143600.jpg  1.144 MB  Uploaded Wed Apr 20 01:10:02 2022  | Show | Hide all | Show all
Attachment 6: 20220419_143821.jpg  1.080 MB  Uploaded Wed Apr 20 01:10:20 2022  | Hide | Hide all | Show all
20220419_143821.jpg
Attachment 7: 20220419_143844.jpg  1.217 MB  Uploaded Wed Apr 20 01:10:34 2022  | Hide | Hide all | Show all
20220419_143844.jpg
ELOG V3.1.5-fc6679b