GRASIAN ASACUSA PBARA POSITRON-LAB HD-BEAM ADV-INST DEPRECATED-ELOG
ASACUSA-MAIN ASACUSA-SPECTROSCOPY ASACUSA-BEAM-PRODUCTION ASACUSA-ARCHIVE ASACUSA-HOW-TO
HBAR-HFS ARCHIVED
MAIN PLASMA CUSP PBAR POSITRON PROTON DETECTOR SLOWEXT ARCHIVE HOW-TO
  ARCHIVE  Not logged in ELOG logo
Message ID: 765     Entry time: Thu Sep 1 14:02:25 2022
Author: Cusp Trap 
Type:  
Category: ADTC snips from presentation 1.9.2022 
Subject:  
Attachment 1: AD_issues_1_1.PNG  837 kB  Uploaded Thu Sep 1 16:03:27 2022  | Hide | Hide all
AD_issues_1_1.PNG
Attachment 2: AD_issues_2_1.PNG  844 kB  Uploaded Thu Sep 1 16:03:30 2022  | Hide | Hide all
AD_issues_2_1.PNG
Attachment 3: yets_plan_1.PNG  487 kB  Uploaded Thu Sep 1 16:16:12 2022  | Hide | Hide all
yets_plan_1.PNG
Attachment 4: yets.PNG  485 kB  Uploaded Thu Sep 1 16:16:17 2022  | Hide | Hide all
yets.PNG
Attachment 5: counting_house.PNG  597 kB  Uploaded Thu Sep 1 16:20:44 2022  | Hide | Hide all
counting_house.PNG
Attachment 6: dewar_delivery_1.PNG  353 kB  Uploaded Thu Sep 1 16:31:16 2022  | Hide | Hide all
dewar_delivery_1.PNG
Attachment 7: summary_loss_1.PNG  139 kB  Uploaded Thu Sep 1 16:37:01 2022  | Hide | Hide all
summary_loss_1.PNG
Attachment 8: summary_and_conclusion.PNG  153 kB  Uploaded Thu Sep 1 16:43:11 2022  | Hide | Hide all
summary_and_conclusion.PNG
ELOG V3.1.5-fc6679b