GRASIAN ASACUSA PBARA POSITRON-LAB HD-BEAM ADV-INST DEPRECATED-ELOG
ASACUSA-MAIN ASACUSA-SPECTROSCOPY ASACUSA-BEAM-PRODUCTION ASACUSA-ARCHIVE ASACUSA-HOW-TO
HBAR-HFS ARCHIVED
MAIN PLASMA CUSP PBAR POSITRON PROTON DETECTOR SLOWEXT ARCHIVE HOW-TO
  ARCHIVE  Not logged in ELOG logo
Message ID: 818     Entry time: Tue Oct 18 14:51:10 2022
Author: Cusp Trap 
Type:  
Category:  
Subject: pbars tuesday 
Attachment 1: ELENA_and_MUSASHI_closed.png  21 kB  Uploaded Tue Oct 18 16:51:15 2022  | Hide | Hide all | Show all
ELENA_and_MUSASHI_closed.png
Attachment 2: ELENA_open_MUSASHI_closed-1.png  21 kB  Uploaded Tue Oct 18 16:51:20 2022  | Hide | Hide all | Show all
ELENA_open_MUSASHI_closed-1.png
Attachment 3: ELENA_open_MUSASHI_closed-2.png  21 kB  Uploaded Tue Oct 18 16:52:52 2022  | Hide | Hide all | Show all
ELENA_open_MUSASHI_closed-2.png
Attachment 4: ELENA_and_MUSASHI_open.png  20 kB  Uploaded Tue Oct 18 16:54:47 2022  | Hide | Hide all | Show all
ELENA_and_MUSASHI_open.png
Attachment 5: ELENA_and_MUSASHI_open-2.png  20 kB  Uploaded Tue Oct 18 16:56:40 2022  | Hide | Hide all | Show all
ELENA_and_MUSASHI_open-2.png
Attachment 6: ELENA_open_MUSASHI_not_opening.png  21 kB  Uploaded Tue Oct 18 16:58:43 2022  | Hide | Hide all | Show all
ELENA_open_MUSASHI_not_opening.png
Attachment 7: BPM_last_two_grids.png  92 kB  Uploaded Tue Oct 18 17:02:55 2022  | Show | Hide all | Show all
Attachment 8: DT_10kV.png  21 kB  Uploaded Tue Oct 18 17:16:17 2022  | Hide | Hide all | Show all
DT_10kV.png
Attachment 9: DT_19kV.png  22 kB  Uploaded Tue Oct 18 17:18:07 2022  | Hide | Hide all | Show all
DT_19kV.png
Attachment 10: 0kV.PNG  223 kB  Uploaded Tue Oct 18 17:33:02 2022  | Hide | Hide all | Show all
0kV.PNG
Attachment 11: 19kV.PNG  19 kB  Uploaded Tue Oct 18 17:33:07 2022  | Hide | Hide all | Show all
19kV.PNG
ELOG V3.1.5-fc6679b