GRASIAN ASACUSA PBARA POSITRON-LAB HD-BEAM ADV-INST DEPRECATED-ELOG
ASACUSA-MAIN ASACUSA-SPECTROSCOPY ASACUSA-BEAM-PRODUCTION ASACUSA-ARCHIVE ASACUSA-HOW-TO
HBAR-HFS ARCHIVED
MAIN PLASMA CUSP PBAR POSITRON PROTON DETECTOR SLOWEXT ARCHIVE HOW-TO
  ARCHIVE, Page 22 of 84  Not logged in ELOG logo
Entry   mixing, entered by Cusp Trap on Mon Oct 16 08:24:12 2023 44x
 
Entry   mixing, entered by Cusp Trap on Mon Oct 16 07:00:17 2023 46x
 

 
Entry   Foil Detector, entered by Automated on Mon Oct 16 06:26:50 2023 
8:00:31 PM
9.102260E-7 3.426916E-7 1.574168E-6 2.610263E-6 2.550579E-6 6.780367E-6 4.180570E-6 3.284469E-6 1.730087E-6 1.319738E-6
3.717328E-7 5.684855E-8 6.147325E-8 2.043218E-6 1.895327E-6 3.636135E-7 -1.158441E-7 2.802722E-7 -2.129109E-7 8.252548E-8
Entry   mixing, entered by Cusp Trap on Sat Oct 14 09:46:20 2023 34x
 
Entry   Foil Detector, entered by Automated on Sat Oct 14 07:03:32 2023 
4:48:03 PM
1.750069E-6 2.746142E-7 1.948187E-6 2.966404E-6 4.060287E-6 7.455632E-6 4.779529E-6 3.752684E-6 2.283604E-6 1.756032E-6
8.584501E-7 2.026980E-7 6.375507E-7 2.546162E-6 2.741625E-6 1.302615E-6 6.801600E-7 6.451543E-7 1.415443E-7 2.572731E-7
Entry   PS down, entered by Cusp Trap on Fri Oct 13 14:15:37 2023 12x
 
Entry   electrons and positrons, entered by Cusp Trap on Fri Oct 13 12:54:45 2023 50x
 
Entry   , entered by Cusp Trap on Fri Oct 13 10:11:30 2023 50x
 
Entry   antiprotons, entered by Cusp Trap on Fri Oct 13 09:15:56 2023 50x
 
Entry   , entered by Cusp Trap on Fri Oct 13 08:35:25 2023 50x
 
Entry   run 202220, entered by Cusp Trap on Fri Oct 13 07:19:13 2023 10x
 
Entry   pbar, entered by Cusp Trap on Fri Oct 13 06:18:14 2023 50x
 
Entry   Foil Detector, entered by Automated on Fri Oct 13 06:15:39 2023 
1:54:57 PM
 xtotal: 0.000000E+0  (volt-seconds)
 ytotal: 0.000000E+0  (volt-seconds)
Entry   , entered by Angela Gligorova on Thu Oct 12 17:23:04 2023 9x
Upload by Giuseppe
Entry   , entered by Angela Gligorova on Thu Oct 12 14:44:09 2023 50x
Uploaded by Giusepppe
Entry   pbar, entered by Cusp Trap on Thu Oct 12 14:09:31 2023 17x
 
Entry   pbar, entered by Cusp Trap on Thu Oct 12 12:38:37 2023 50x
 
Entry   Panel Images, entered by Cusp Trap on Thu Oct 12 10:26:20 2023 Screenshot_from_2023-10-12_12-25-38.pngScreenshot_from_2023-10-12_12-26-47.png3666.png3667.png3668.png
 
Entry   mixing, entered by Cusp Trap on Thu Oct 12 08:18:08 2023 50x
 
Entry   antiprotons, entered by Cusp Trap on Thu Oct 12 05:53:30 2023 33x
 
ELOG V3.1.5-fc6679b