GRASIAN ASACUSA PBARA POSITRON-LAB HD-BEAM ADV-INST DEPRECATED-ELOG
ASACUSA-MAIN ASACUSA-SPECTROSCOPY ASACUSA-BEAM-PRODUCTION ASACUSA-ARCHIVE ASACUSA-HOW-TO
HBAR-HFS ARCHIVED
MAIN PLASMA CUSP PBAR POSITRON PROTON DETECTOR SLOWEXT ARCHIVE HOW-TO
  ARCHIVE, Page 5 of 84  Not logged in ELOG logo
Entry   pbarA, entered by Cusp Trap on Sun Oct 29 12:18:56 2023 50x
 
Entry   saturday 28-10 rescaled, entered by Cusp Trap on Tue Oct 31 13:25:37 2023 50x
 
Entry   plots-morning 11-3 only mixing and dump, entered by Cusp Trap on Fri Nov 3 09:56:05 2023 12x
 
Entry   bar detector analysis, entered by Cusp Trap on Thu Dec 14 16:42:22 2023 heating_nopos_1.pngheatin_pos_1.pngheating_nopos_tvsz_1.pngheating_pos_tvsz_1.png
 
Entry   Ten Power Inc. power supply manual, entered by Cusp Trap on Fri Mar 3 10:54:15 2023 P10_P60-P80-D3_DC_M550001-01.pdf
This should be the manual for the Ten Power Inc. power supply at the bottom of the e+ line power supply rack.
Manual covers the P series by Ten Power Inc., the front panel of ours looks like it is a P63 (output <= 60 V) or P83 (output >= 80 V, says
the manual...).
Entry   electronics, entered by Cusp Trap on Mon Aug 28 17:19:42 2023 8x
 
Entry   , entered by Andreas Lanz on Wed Jun 15 12:37:41 2022 33x
 
Entry   , entered by Cusp Trap on Mon Sep 5 05:39:18 2022 20x
 
Entry   , entered by Cusp Trap on Mon Aug 29 06:01:42 2022 39x
 
Entry   , entered by Andreas Lanz on Thu Aug 18 11:45:22 2022 31x
 
Entry   , entered by Andreas Lanz on Mon Aug 15 05:48:55 2022 50x
 
Entry   , entered by Cusp Trap on Thu Aug 25 14:20:04 2022 50x
 
Entry   , entered by Cusp Trap on Wed Aug 24 07:24:29 2022 50x
 
Entry   , entered by Cusp Trap on Mon Aug 22 07:20:33 2022 50x
 
Entry   , entered by Cusp Trap on Mon Aug 8 08:13:02 2022 24x
 
Entry   Enomoto Circuits, entered by Cusp Trap on Tue Sep 29 14:02:25 2020 Enomoto_2011_circuits.pdf
Appendix D of Enomoto 2011 (thesis) is attached.
Entry   Friday, entered by Cusp Trap on Fri Oct 9 10:34:30 2020 fft_m9_postfilter.pngfft_m9_prefilter.pngfft_m12_feedthru.png
 
Entry   Tuesday, entered by Cusp Trap on Tue Oct 13 11:27:56 2020 cooldown.PNG
 
Entry   Wednesday, entered by Cusp Trap on Wed Oct 14 16:01:58 2020 e-.PNG
 
Entry   Thursday, entered by Cusp Trap on Thu Oct 15 07:55:16 2020 8x
 
ELOG V3.1.5-fc6679b