GRASIAN ASACUSA PBARA POSITRON-LAB HD-BEAM ADV-INST DEPRECATED-ELOG
ASACUSA-MAIN ASACUSA-SPECTROSCOPY ASACUSA-BEAM-PRODUCTION ASACUSA-ARCHIVE ASACUSA-HOW-TO
HBAR-HFS ARCHIVED
MAIN PLASMA CUSP PBAR POSITRON PROTON DETECTOR SLOWEXT ARCHIVE HOW-TO
  ARCHIVE, Page 38 of 84  Not logged in ELOG logo
ID Date Author Typedown Category Subject Text Attachments
  626   Wed Jul 6 07:26:16 2022 Cusp TrapfeuilleOttoredoubt 

09:28:40
0-10-20-30-40-40-30-20-10-0
  
  1642   Thu Jun 13 07:29:22 2024 Cusp TrapelectronicsBUMBARmagnet controller   9x 
  1523   Fri Mar 8 17:01:46 2024 Cusp Trapcryogenics BUMBARCold head reassembly    15x 
  1525   Wed Mar 13 08:35:58 2024 Cusp Trapbuncher rewindBUMBARBuncher short + rewind   11x 
  1273   Fri Oct 13 07:19:13 2023 Cusp Trapbrescia panelGiovannirun 202220   10x 
  1374   Tue Oct 31 13:25:37 2023 Cusp Trapbrescia panelGiovannisaturday 28-10 rescaled   50x 
  1395   Fri Nov 3 09:56:05 2023 Cusp Trapbrescia panelGiovanniplots-morning 11-3 only mixing and dump   12x 
  1515   Thu Dec 14 16:42:22 2023 Cusp Trapbrescia panelGiovannibar detector analysis   heating_nopos_1.pngheatin_pos_1.pngheating_nopos_tvsz_1.pngheating_pos_tvsz_1.png 
  534   Wed Apr 13 14:34:33 2022 Andreas LanzWednesday     Electrodes_on_hits.jpgelectrodes.jpgPlate.jpgTwo_Sides_of_plate_1.jpg 
  530   Tue Mar 29 14:04:21 2022 Andreas LanzTuesday FPS     9x 
  509   Thu Mar 17 15:08:25 2022 Cusp TrapThursday FPS     external_pump.jpgleak.jpgpressure_sensors.jpg 
  520   Thu Mar 24 11:57:38 2022 Andreas LanzThursday FPS     11x 
  535   Thu Apr 14 11:20:55 2022 Andreas LanzThursday     leaking_feedthrough.jpgleaking_feedthrough-flipped_side.jpgzoomed_in_1.jpgunplugged_connectors.jpg 
  547   Fri Apr 29 13:02:54 2022 Cusp TrapSkroll pump tip seal     open_pump_1.jpgpump.jpg 
  328   Tue Jul 27 09:11:07 2021 Cusp TrapPresentationEricSMI presentation   ASACUSA@SMI__27_7_21.pdf 
  333   Tue Aug 3 08:15:18 2021 Cusp TrapPictures 20210803 Positron system   moderatorgrowth-20210803.PNG20210803_trapping-test.PNG 
  538   Tue Apr 19 23:03:47 2022 Cusp TrapPhotosDrifttube An extension duct + TMP were connected
at the bottom of the downstream side of the
drifttube (deflectors are inside) -> Replaced
 7x 
  539   Wed Apr 20 07:15:59 2022 Cusp TrapPhotoMUSASHI Cryocooler for MUSASHI magnet : bottom
right (Center cold head)
 20220420_091254_s.jpg 
  540   Wed Apr 20 12:27:32 2022 Cusp TrapPhotoHodoscope Three boxes in the vacuum hat.  20220420_141556.jpg20220420_141622.jpg20220420_141659.jpg20220420_141725.jpg 
  542   Mon Apr 25 08:32:46 2022 Cusp TrapMonday pbar     6x 
ELOG V3.1.5-fc6679b