GRASIAN ASACUSA PBARA POSITRON-LAB HD-BEAM ADV-INST DEPRECATED-ELOG
ASACUSA-MAIN ASACUSA-SPECTROSCOPY ASACUSA-BEAM-PRODUCTION ASACUSA-ARCHIVE ASACUSA-HOW-TO
HBAR-HFS ARCHIVED
MAIN PLASMA CUSP PBAR POSITRON PROTON DETECTOR SLOWEXT ARCHIVE HOW-TO
  ARCHIVE, Page 44 of 84  Not logged in ELOG logo
Entry   antiprotons, entered by Cusp Trap on Fri Oct 28 09:24:56 2022 21x
 
Entry   electronic board connection - filter box Annex, entered by Cusp Trap on Thu Oct 27 13:49:25 2022 8x
 
Entry   higaki C and B magnet connection, entered by Cusp Trap on Thu Oct 27 08:14:02 2022 magnet5.jpgmagnet4.jpg
 
Entry   FPS Oct 27-28, entered by Cusp Trap on Thu Oct 27 05:21:18 2022 49x
 
Entry   foil output, photos, entered by Cusp Trap on Wed Oct 26 10:55:32 2022 26x
 
Entry   Foil Detector, entered by Automated on Wed Oct 26 10:39:53 2022 
2:48:52 PM
4.240679E-7 1.122164E-6 5.673939E-7 7.267908E-7 5.148024E-6 3.701751E-6 7.799645E-6 7.081616E-6 3.516580E-6 1.727412E-6
8.008236E-7 1.448915E-6 3.599684E-6 6.080834E-6 6.172336E-6 6.707704E-6 3.709361E-6 2.157693E-6 7.052038E-7 1.047107E-6
Entry   camera, entered by Cusp Trap on Wed Oct 26 09:48:35 2022 8x
 
Entry   FPS Oct 25-28, entered by Cusp Trap on Tue Oct 25 12:15:11 2022 48x
 
Entry   FPS Oct 24-28, entered by Cusp Trap on Mon Oct 24 06:49:51 2022 50x
 
Entry   FPS Oct 22, entered by Cusp Trap on Sat Oct 22 07:50:30 2022 7x
 
Entry   Foil Detector, entered by Automated on Thu Oct 20 21:44:08 2022 
11:44:09 PM
4.641448E-7 1.195589E-6 5.320804E-7 2.642578E-6 6.087321E-6 5.246349E-6 1.450780E-6 1.208022E-6 6.503331E-7 5.900242E-7
8.805187E-7 9.208601E-7 2.312927E-6 6.502004E-6 6.232712E-6 5.697884E-6 3.322152E-6 1.670971E-6 6.570216E-7 7.871611E-7
Entry   frequency scan, entered by Cusp Trap on Thu Oct 20 20:31:33 2022 plasma.jpg
 
Entry   sf6 calibration, entered by Cusp Trap on Wed Oct 19 11:33:21 2022 flowrate.png
 
Entry   Foil Detector, entered by Automated on Wed Oct 19 07:26:07 2022 
12:32:38 PM
4.641448E-7 1.195589E-6 5.320804E-7 2.642578E-6 6.087321E-6 5.246349E-6 1.450780E-6 1.208022E-6 6.503331E-7 5.900242E-7
8.805187E-7 9.208601E-7 2.312927E-6 6.502004E-6 6.232712E-6 5.697884E-6 3.322152E-6 1.670971E-6 6.570216E-7 7.871611E-7
Entry   AEgIS magnet cycle , entered by Cusp Trap on Wed Oct 19 06:50:09 2022 27x
 
Entry   Foil Detector, entered by Automated on Tue Oct 18 15:13:28 2022 
5:18:43 PM
8.408030E-7 1.459034E-6 6.891582E-7 1.105395E-6 6.420345E-6 8.061033E-6 5.803936E-6 2.548297E-6 1.861406E-6 9.767515E-7
7.712122E-7 1.079517E-6 2.982144E-6 6.066267E-6 6.070575E-6 6.457760E-6 3.403371E-6 1.946551E-6 6.543840E-7 8.394609E-7
Entry   pbars tuesday, entered by Cusp Trap on Tue Oct 18 14:51:10 2022 11x
 
Entry   FPS images Oct 17-21, entered by Cusp Trap on Mon Oct 17 08:44:14 2022 49x
 
Entry   blackout predictions, entered by Cusp Trap on Mon Oct 17 07:13:21 2022 Preparation_electrical_blackout.pdf
see attached. Presentation given by Olga Bertramello (DSO?) CMT = crisis management team

"scenario 1, announced load shedding, is 100% likely, several times this winter, probably not before Nov. 1"
"scenario 3, unannounced blackout, is unlikely"
Entry   pbar, entered by Cusp Trap on Fri Oct 14 08:44:59 2022 12x
 
ELOG V3.1.5-fc6679b