GRASIAN ASACUSA PBARA POSITRON-LAB HD-BEAM ADV-INST DEPRECATED-ELOG
ASACUSA-MAIN ASACUSA-SPECTROSCOPY ASACUSA-BEAM-PRODUCTION ASACUSA-ARCHIVE ASACUSA-HOW-TO
HBAR-HFS ARCHIVED
MAIN PLASMA CUSP PBAR POSITRON PROTON DETECTOR SLOWEXT ARCHIVE HOW-TO
  ARCHIVE, Page 9 of 84  Not logged in ELOG logo
Entry   electrons, entered by Cusp Trap on Wed Jul 27 08:31:38 2022 50x
 
Entry   electrons, entered by Cusp Trap on Thu Jul 28 09:56:51 2022 23x
 
Entry   Hodoscope, entered by Cusp Trap on Sat Jul 30 07:29:40 2022 8x
 
Entry   LabVIEW, entered by Cusp Trap on Tue Aug 2 08:03:40 2022 21x
 
Entry   electrons, entered by Cusp Trap on Mon Aug 8 08:19:26 2022 42x
 
Entry   ERC writing checklist, entered by Cusp Trap on Wed Oct 5 09:23:49 2022 revOeAW_Writing_Advice.pdf
 
Entry   pbar, entered by Cusp Trap on Fri Oct 14 08:44:59 2022 12x
 
Entry   blackout predictions, entered by Cusp Trap on Mon Oct 17 07:13:21 2022 Preparation_electrical_blackout.pdf

see attached. Presentation given by Olga Bertramello (DSO?) CMT = crisis management team

"scenario 1, announced load shedding, is 100% likely, several times this winter, probably not before Nov. 1"
"scenario 3, unannounced blackout, is unlikely"

"configuration 1,2,3 do not impact experiments"
"however, this is theoretical. if they do not actually reach the expected power reduction, they will switch off some experiments, starting with north and east area"

"half past 9 pm is also when we find out which hours to shed the next day"

"even in case of blackout, probably switch over to swiss power for experiments; this is a critical operation but has been tried and tested recently so probably seamless"

"in case of total blackout, first thing is to evacuate the site"

"AMS: at the ISS, agreement is power comes back within 4 hours. In 11 years, this hasn't failed. 
--we can come in, work in the dark, computers are on UPS
--but do we have network, internet, on site?"
"answer: we don't know, probably not unless we generate a solution now..."

Entry   foil output, photos, entered by Cusp Trap on Wed Oct 26 10:55:32 2022 26x
 
Entry   antiprotons, entered by Cusp Trap on Fri Oct 28 09:24:56 2022 21x
 
Entry   pbar, entered by Cusp Trap on Sat Oct 29 16:29:34 2022 17x
 
Entry   pbar, entered by Cusp Trap on Tue Nov 1 17:12:31 2022 49x
 
Entry   positrons, entered by Cusp Trap on Sat Nov 5 07:59:11 2022 33x
 
Entry   pbar, entered by Cusp Trap on Mon Nov 7 13:15:46 2022 24x
 
Entry   pbar, entered by Cusp Trap on Wed Nov 9 11:46:17 2022 50x
 
Entry   pbar, entered by Cusp Trap on Fri Nov 18 12:41:41 2022 33x
 
Entry   pbar, entered by Cusp Trap on Mon Nov 21 12:10:46 2022 44x
 
Entry   electrons, entered by Cusp Trap on Tue Nov 22 07:34:33 2022 20x
 
Entry   Crane test, entered by Cusp Trap on Tue Nov 22 09:40:32 2022 11x
 
Entry   antiprotons, entered by Cusp Trap on Wed Nov 23 13:05:44 2022 11x
 
ELOG V3.1.5-fc6679b